Everbright E610 Polycarbonate Light Panel Installation Guide
Mono-pitched Applications:
Click image to open
large version or pdf
Eaves
- For pitched roofs above 20-degree fix aluminium angle EL17 to supporting structure with self drilling screws at 180mm maximum centres, or otherwise calculated.
- Lay light panel units into angles and ensure joints are correctly interlocked. Insert plastics locking bars into joints between units.
- Insert profile filler, reference EL136, between underside of light panel units and face of supporting structure.
- When 4 light panel units have been laid, fix first 2 units. Place EL154 clamping washers over 2 of every 3 ribs in material and drill 5.5mm dia hole through material to supporting structure. Fix to timber with 5 x 100mm woodscrews EL56 or to steel structure with self drilling screws EL158.
- Lay 2 further light panel units and repeat procedure.
Click image to open
large version or pdf
Verges and abutments
- Place EL154 clamping washers at 600mm centres on final rib in material and drill 5.5mm dia hole through material to supporting structure.
- Fix to timber with 5 x 100mm woodscrews EL56 or to steel structure with self drilling screws EL158.

Click image to open
large version or pdf
Intermediate supports
- Thermal movement of the material must be considered when screw fixing to intermediate supports. Generally, 1 of every 6 ribs is fixed.
- If there are 2 or more supports, this fixing interval is staggered, creating a ‘diamond’ pattern. The fixing incorporates the use of the EL154 clamping washer with the appropriate screw fixing as stated above.

Click image to open
large version or pdf
Ridge
- Pre-drill EL28 locking plate at the same frequency as required for the eaves.
- Place EL154 clamping washers over 2 of every 3 ribs in material and drill 5.5mm dia hole through material to supporting structure.
- Place EL28 over material matching pre-drilled holes to clamping washers.
- Fix to timber with 5 x 100mm woodscrews EL56 or to steel structure with self drilling screws EL158.

Click image to open
large version or pdf
Barrel vault applications:
Eaves
- Fix aluminium angle EL16 to supporting structure with self drilling screws at 180mm maximum centres, or otherwise calculated
- Lay light panel units into angles and ensure joints are correctly interlocked. Insert plastics locking bars into joints between units.
- Insert profile filler, reference EL136, between underside of light panel units and face of supporting structure.
- When 4 light panel units have been laid, fix first 2 units.
Drill through aluminium angle and secure units with M8 bolts at predetermined fixing positions.
- Lay 2 further light panel units and repeat procedure.